Mirror Engineer
MIRROR ENGINEER™
Confidential · Investor Brief
We don’t sell software. We sell time.
What’s your time worth?

DRAG  ·  DROP
DONE.

Drop your plan. AI reads the scale. Get your quantities. Bluebeam, Excel, PlanSwift, yellow notepad — doesn’t matter. No Sunday nights. No guessing.

#1
Construction Estimating
860+
SKUs in Cost DB
~98%
Foundation Pack — knocking
The raise
$1,000,000
the software · one deal
Launch Mirror Engineer$1.0M
Founder’s hardware patents (CTBS — not this deal)2
The technology — why it wins

It reads the vector layers. No one else does.

Drop a plan; the engine reads the engineer’s vector layers, auto-scales with no setup, paints the takeoff on the engineer’s own sheet, and drops out a bid-ready schedule & estimate. Today it does concrete foundation takeoff — built for concrete & foundation contractors and the estimators who bid them. The same engine then extends to framing, the other trades, and the general contractor’s full estimate.

98%
match to a hand takeoff on validated test plans
392.46 CY
868 LF — recovered on the benchmark
Foundations
98% complete; framing & the GC estimate next

See the schedules & estimate — the magic

Mirror Engineer 36x24 takeoff sheet — painted plan + schedules

The stack — priced piece by piece

Every reveal moved the number. Each engine below was priced independently at open-market US rates (Cost & Equity Report, June 2026):

Plan reader — vector + raster layers, callout OCR$210K–$260K
Placement & tracing — footing inventory, wall snake-spine tracer$135K–$170K
Quantity & schedule engine — concrete/rebar, waste, elevations, steps$120K–$155K
Painted Plan Editor — drag / lock / print, dynamic sheet size$60K–$80K
Domain encoding — 30 years of structural estimating rules$50K–$70K (understated — the moat)
QA + check layers + training data + PM/infra$170K–$270K

US-market rebuild to current state: $900K–$1.5M. Fully productized: $1.8M–$3.0M. The $1.0M ask buys into an asset whose open-market rebuild cost already exceeds the investment — before the category comps ($50M Togal cap · $48M Beam AI raised · $100M Bluebeam exit) even enter the room.

The full 36×24 sheet — painted plan with every footing, wall & step, plus the takeoff schedules.

Every schedule the engine produces

From one plan, bid-ready — click any to read full size.

Drop a plan → the engine paints it → bid-ready schedules
1 · Drop a plan
PDF or image
2 · Engine paints...
footings · walls · piers · rebar
3 · Bid-ready schedules
quantities + waste ↓
MIROR ENGINEER · WALL HEIGHTS5%
627 LF · 144→151 CY +W
Color = wall height. CY = thk x ht x LF / 27. Elevations TOF/TOW per row; waste% live from concrete·walls.
HEIGHTTOFTOWTHKLFCYW%+W CY
4'-0"6960.506964.5010"23126.15%27.4
4'-6"6965.006969.5010"446.05%6.3
4'-9"6960.506965.2510"223.35%3.5
5'-3"6965.006970.2510"121.95%2.0
5'-6"6960.506966.0010"335.65%5.9
7'-6"6965.006972.5010"5111.85%12.4
8'-0"6960.506968.5010"51.25%1.3
8'-6"6964.006972.5010"153.85%4.0
10'-0"6960.506970.5010"206.15%6.4
11'-6"6952.006963.5010"176.15%6.4
12'-6"6952.006964.5010"2911.25%11.8
12'-9"6952.006964.7510"5321.05%22.1
13'-3"6952.006965.2510"8836.25%38.0
16'-0"6948.506964.5016"73.65%3.8
TOTAL627144
+ WASTE → ORDER151.2
S-100 · sample job
MIROR ENGINEER · FOOTINGS5%
Cont 627 LF · Ret 191 LF
Continuous & retaining footings stacked. CY + waste live from concrete·footings; T.O.F. per row.
CONTINUOUS FOOTINGS (FC) · 627 LF · 30→32 CY +W
MARKWIDTHT.O.F.LFCYW%+W CY
FC-2.02'-0"per wall50223.95%25.1
FC-1.71'-8"per wall1255.55%5.8
TOTAL62729.4
+ WASTE → ORDER30.9
RETAINING FOOTINGS (RW) · 191 LF · 51.4 CY
MARKWIDTHLFCYW%+W CY
RW 3'-9"3'-9"345.85%6.1
RW 4'-3"4'-3"305.85%6.1
RW 6'-0"6'-0"5515.05%15.8
RW 7'-3"7'-3"5919.55%20.5
RW 9'-0"9'-0"135.35%5.3
RETAINING TOTAL19151.4
+ WASTE → ORDER54.0
T.O.F. 6948.5–6965.25 ft — tops follow the wall T.O.F. schedule. Retaining reinforcing routed by base slab (Det 14/16); stem steel 3,614 lb rolls into Total Steel.
Continuous LF/type est. by callout ratio · retaining CY apportioned to 51.4
MIROR ENGINEER · SPOT FOOTINGS5%
66 EA · 126→132 CY +W
Spot/spread footings (FS) by size off S-100. Size, depth, qty, CY, waste% and +W per row.
MARKSIZEDEPQTYCYW%+W CY
FS-2.52'6×2'612"51.25%1.3
FS-3.03'0×3'012"31.05%1.1
FS-3.53'6×3'612"62.75%2.8
FS-4.04'0×4'012"84.75%4.9
FS-4.54'6×4'612"64.55%4.7
FS-5.05'0×5'012"65.65%5.9
FS-5.55'6×5'612"44.55%4.7
FS-6.06'0×6'016"58.95%9.3
FS-6.56'6×6'616"36.35%6.6
FS-7.07'0×7'016"829.05%30.5
FS-7.57'6×7'616"520.85%21.8
FS-8.08'0×8'024"314.25%14.9
FS-8.58'6×8'624"316.15%16.9
FS-9.59'6×9'624"16.75%7.0
TOTAL66126.1
+ WASTE → ORDER132.4
T.O.F. per wall schedule · CY pending footing detail
MIROR ENGINEER · CONCRETE PIERS5%
6 EA · 3.8→4 CY +W
Mark = size. CY at 4' placeholder; elevation sets true height. Pier rebar in Rebar panel, section 3.
MARKSIZEH ftQTYCYW%
CP-1818"x18"wall10.335%
CP-2424"x24"10.021.195%
CP-2626"x26"wall21.395%
CP-3030"x30"wall10.935%
TOTAL63.8
◆ 2 isolated piers carry a steel column (T.O.P. 6962'); 4 embedded follow their wall.
* CY needs pier depth
MIROR ENGINEER · REBAR
#4 423 · #5 327 STK +W
All reinforcing in one panel: footing · wall · opening+pier. Base, waste% and +W per row.
CONFIRMED TOTAL · BY SCOPE#4#5
Walls (vert + horiz)182311
Footings (horiz + J-bar)220-
TOTAL 20' STICKS402311
+ WASTE → ORDER423327
1 · FOOTING REBAR5% — horiz + all J-bar + steps + spot mat
ITEMBARSTKW%+W STK
Footing horiz + J-bar#42205%231
Spot-footing mat (eng dflt)#52205%231
Footing-step dowels (eng dflt)#465%7
556 J-BAR dowels at footing–wall interface. Spot-mat (#5 @12" E.W.) & step dowels are engine defaults — not in the 402/311 confirmed total; confirm vs FS/step detail.
2 · FOUNDATION WALL REBAR5% — verticals + horizontals
WALL VERT CUTSBARSPCUTQTYSTKW%+W STK
4'-0"#416"3'-8"173325%34
4'-6"#416"4'-2"3375%8
4'-9"#416"4'-5"1745%5
5'-3"#416"4'-11"935%4
5'-6"#416"5'-2"2575%8
7'-6"#416"7'-2"38145%15
8'-0"#416"7'-8"425%3
8'-6"#512"8'-2"1575%8
10'-0"#512"9'-8"20105%11
11'-6"#512"11'-2"17105%11
12'-6"#59"12'-2"39245%26
12'-9"#59"12'-5"71455%48
13'-3"#512"12'-11"88575%60
16'-0"#512"15'-8"765%7
556 VERT · #4 182 / #5 311
3 · OPENING & PIER (CP) REBAR5%
FDN OPENING SPANLINTEL REINFd MIN
≤ 4'-0"(2) #48"
4'-1" to 6'-0"(2) #412"
6'-1" to 9'-0"(2) #512"
9'-1" to 10'-0"(2) #5 T&B16"
At each opening: (1) #4 jamb each side & (1) #4 sill, extend 24". Lintels 414 lb (Det 3).
PIER (Det 12)H ftVERTS#3 TIESW%+W lb
CP-24 ◆ (2)10.08×#6285%
CP-18 (1)wall8×#6235%
CP-26 (2)wall12×#6235%
CP-30 (1)wall12×#6285%
PIER STEEL (lb)1,4941,569
◆ = 2 isolated CP-24 (T.O.P. 6962'); other 4 embedded (top = wall T.O.W.). Pier & lintel steel drive Total Steel via the rebar·walls knob.
Walls #4 182 / #5 311 · Footings #4 220 · Grade 60
MIROR ENGINEER · HOLD-DOWNSno waste
24 EA
Hold-down hardware by mark. Hardware count — no waste factor; +W = qty.
MARKSPECQTYW%+W EA
HD-3anchor88
HD-4anchor66
HD-5anchor55
HD-6anchor22
HD-7anchor33
TOTAL2424
Holddown schedule S-100
MIROR ENGINEER · STEPSno waste
35 STEPS
Footing + wall steps. Each forces a wall break. Count — no waste factor; +W = qty.
STEP TYPESPECQTYW%+W EA
Footing steps (F.S.)break1414
Wall steps (W.S.)break2121
TOTAL3535
drives the wall count
MIROR ENGINEER · ORDER (+ WASTE)
Four waste knobs — concrete & rebar, footings & walls. Each drives its order qty + schedule cards live.
WASTE %FOOTINGSWALLS
Concrete
Rebar
ORDERBASE+WASTE
Footing conc (CY)207.6218.0
Wall conc (CY)147.0154.3
Ftg rebar #5 (stk)311327
Wall rebar #4 (stk)402423
STEEL WEIGHT (lb)BASE+WASTE
Walls + footings #4/#59,53610,013
Pier verts (#6)1,0541,107
Pier #3 ties (153)440462
FDN lintels #4/#5414435
Retaining stems3,6143,795
TOTAL STEEL (lb)15,05915,812
TOTAL STEEL (ton)7.537.91
Total steel now folds in piers (verts + #3 ties), lintels & retaining stems — driven live by the rebar·walls knob. Bar weights: #3 .376 · #4 .668 · #5 1.043 · #6 1.502 lb/ft. Pier/lintel/retaining counts are rule-applied — confirm vs plan.
Footings = spot + continuous + retaining. Walls = walls + piers. Waste live; report inherits.

Live Takeoff — Waste Calculator

WASTE %
Concrete (CY)CYW%Order
Continuous footings (FC-1.7/2.0)29.4%-
Spot footings (FS)126.1%-
Retaining-wall footings51.4%-
Foundation walls144.0%-
Concrete piers (callout depths)11.8%-
Total concrete362.7-
Steel (lb)lbW%Order
Footing rebar (horiz + J-bar)*2,365%-
Retaining-wall stems3,614%-
Wall rebar (vert+horiz)*7,171%-
Pier verticals #61,054%-
Pier #3 ties (153)440%-
FDN lintels414%-
Total steel15,058-
Total steel (ton)7.53-
* footing/foundation split derived from painted scope — confirm vs engine. Footing-step concrete/rebar pending step deltas. FC-1.5 on schedule, not placed.

The schedules are the product. Quantities pull from the painted plan; unit prices pull from your own cost DB (860+ SKUs); it exports to Google Sheets, QuickBooks & Revit — a bid-ready printout, not a markup someone still has to total by hand.

Painted permit set with takeoff schedules — click to zoom

Click any image to zoom.

The asset sheet

What the investor steps into.

Real, built work — not a blank page. This raise is one piece: the Mirror Engineer estimating software. And there’s real upside on deck: two U.S. patents are already granted and the CTBS hardware is designed and ready to manufacture. It isn’t sold in this deal — but doing this deal puts the investor first in line to invest in CTBS’s coming hardware & patents.

Mirror Engineer™ — the estimating engine
Vector-layer takeoff & schedules; ~$250K+ of engineering already built; foundation takeoff is ~98% complete (validated on test plans).
Built
BIM / Revit library
18-month Revit build — EZ-Footings & Western Forms wall/footing forming families; turns a 3D model into a forming layout and an equipment order.
Built
Coming next — CTBS hardware & patents · you’re first in line
Two U.S. patents granted; the hardware is designed and on deck to build. Not included in this transaction — but this deal earns the investor a first right to invest in CTBS’s up-and-coming hardware & patents.
U.S. Patent certificate
U.S. patents (2)
Climate-Wall (US 11,933,057 B2) & Climate-Deck (US 12,188,232) — issued.
Granted
Climate-Deck™ system designs
Floor / roof / ceiling — EPS forms, 24′–50′ spans; Rebar Tree, Vertical Tie, Rebar Chair, Locking Pin Wedge.
Designed
Climate-Ties™ system designs
Wall anchoring for aluminum, steel & CMU forms; Center Tie, T-Tie, 90° Corner Tie.
Designed
Climate-Wall™ panelized wall system
Patented panelized wall system (CTBS hardware).
Designed
prior-company injection-mold designs (SolidWorks)
Mold designs engineered from the founder’s Revit templates; mold manufacturer lined up.
Designed
PIPELINE
Post-tension forming systems
Additional, unreleased systems — pipeline IP. (Visual is a placeholder.)
In development
The proprietary Revit library

A BIM library no competitor has.

An 18-month Revit build of the full EZ-Footings and Western Forms forming families, modeled to spec. Drop them onto a real foundation plan and the model becomes a forming layout — and an equipment order. Below: EZ-Footings / Western Forms forming modeled on the Silver Mine Road foundation set.

EZ-Footings / Western Forms forming — Silver Mine Road Foundation forming layout — Silver Mine Road Climate-Deck system model Climate-Deck structural model
Where the engine is:  ✓ Foundation Pack — ≥95% on validated test plans  →  hardening to production (100%)  →  then framing & the full GC estimate
The ask

One deal — the software. $1,000,000.

The Mirror Engineer software — a firm proposal that stands entirely on its own. A 15% loan, or 20% equity with a Year 5–8 buyback ladder.

Deal 1 — Mirror Engineer
$1.0M
Launch the software. A 15% loan, or 20% equity with a Year 5–8 buyback ladder.

Two paths to $1,000,000

Live Deal Calculator

DEAL TERMS
YearBuybackGainMOICIRRImplied biz value
Year 5$1,750,000$750,0001.75×11.84%$8,750,000
Year 6$1,950,000$950,0001.95×11.77%$9,750,000
Year 7$2,150,000$1,150,0002.15×11.56%$10,750,000
Year 8$2,350,000$1,350,0002.35×11.27%$11,750,000
Option A — Debt (loan)
Capital provided$1,000,000
Structure5-yr amortizing loan
Annual rate15.00% interest
Monthly payment$23,789.93
Total repaid (Yr 5)$1,427,396 · 1.43×

Conservative / lender posture. Monthly obligation pulls cash before revenue ramps.

Option B — Equity buyback · RECOMMENDED
Investment$1,000,000
Equity stake20%
Implied entry valuation$5,000,000
Monthly paymentsNone
Base buyback (Yr 5)$1,750,000 · 1.75×
Buyback ladder: Yr 5 $1.75M (1.75×) · Yr 6 $1.95M · Yr 7 $2.15M · Yr 8 $2.35M (+$200K/yr if declined). No monthly drain — capital stays in the business.

Use of funds ($1,000,000)

UseAllocationPurpose
Founder compensation$300,000~$175K/yr so the founder goes full-time — the single biggest unlock.
Software developer (coder)$130,000Contract developer to finish and harden the engine and storefront.
Revit operator #1 — ME library$110,000One full-time operator building the EZ-Footings & Western Forms families — a second added as revenue allows.
Intellectual property & legal$100,000Patent & IP counsel — in line with the ~$80–100K that secured the founder’s prior-company hardware patents.
Go-to-market$130,000Marketing, ads, and the founder’s industry & national-brand channels.
Operations$80,000~$60K/yr base cost to run the business.
Contingency / reserve$150,000Buffer and debt-service reserve — also funds the second Revit operator once revenue supports it.
Total$1,000,000

Allocation is the deployment plan for the raise; final split confirmed with the investor. Reporting and use-of-funds discipline are covered under Investor Protections below.

Pricing model — built on the industry structure

Three ways in: pay-per-takeoff, annual credit plans (the core model), and the BIM add-on — every plan priced below the incumbents.

1 · Grab & Go — pay per takeoff (no subscription)
Single
$89 /takeoff
One painted takeoff · your logo on the bid.
5-Pack
$375 (~$75 ea)
Five takeoffs · credits never expire.
10-Pack
$650 (~$65 ea)
Ten takeoffs · best per-takeoff rate.
2 · Annual Plans — credit-based (the main model)
Starter
$1,200 /yr
Solo estimator · ~20 credits/yr · Foundation Pack.
Pro MOST POPULAR
$1,800 /yr
~75 credits/yr · all trades as they roll out · priority support.
Team / Unlimited
$2,400 /yr company
Unlimited takeoffs · multiple seats.
3 · BIM Library Access — add-on (when ready)
BIM Access
$900 /yr
Full EZ-Footings + Western Forms families · updates as catalog grows.
Per-Family
$TBD /download
One-off purchases for occasional users.
Priced under the incumbents: Bluebeam $260–590 · PlanSwift ~$1,749 · Square Takeoff $1,699/yr · STACK ~$3,000 · Togal ~$3,588. Credit allotments scale with the plan.

Break-even — units to cash-flow positive

UNIT ECONOMICS
ACCOUNTS TO CASH-FLOW POSITIVE
314
$47,100/mo revenue at break-even
AccountsMonthly revOp costMonthly P&L
157$23,550$40,000$-19,982
236$35,400$40,000$-9,910
314 ◀ break-even$47,100$40,000+$35
471$70,650$40,000+$20,053
628$94,200$40,000+$40,070
Contribution/seat = price × gross margin. Break-even seats = monthly operating cost ÷ contribution. P&L is after gross margin. Inputs are editable assumptions — set them to your real pricing & burn.
See it · output

See the Foundation Report

The full priced takeoff/estimate the engine generates from a dropped plan — a real, rendered report (sample job).

Foundation Report page 1Foundation Report page 2Foundation Report page 3Foundation Report page 4Foundation Report page 5Foundation Report page 6Foundation Report page 7
7-page sample report · scroll to view all pages.
The asset

Revit Family Database

The 18-month BIM build: an organized Revit family library — EZ-Footings, forming walls (aluminum/steel/precast), Climate-Deck, CMU, rebar and more — the families that turn a 3D model into a forming layout and an equipment order. AI auto-modeling coming soon via the WiseBIM integration — drop a PDF, the model builds itself.

10+ family systems
18-mo Revit 2024 build
3D → layout + equipment order
EZ-Footings
Patented footing forming system
Forming Walls
Aluminum · steel · precast wall form families
Climate-Deck
EPS floor / roof / ceiling — 24′–50′ spans
Climate-Ties
Wall anchor rails: center, T, 90° corner
Rebar
Chairs, trees, J-bar, pier ties
CMU Block Wall
Masonry unit families
Tilt-Up
Tilt-up wall panels
Shoring
Shoring & bracing
System Drawings
Assemblies & detail sheets
Organized Revit 2024 family library — drop the families into a model and the engine turns it into a forming layout and an equipment order. (3D family renders in the BIM Library section above.)
See it · live

Mirror Engineer™ site

The product site — the estimating engine, embedded.

Open mirrorengineer.com ↗ — opens the live site.
See it · live

ClimateBuilt™ site

The hardware company — patented systems & forming, embedded.

Open climatebuilt.com ↗ — opens the live ClimateBuilt site.
The offer

Offer — Term Sheet & DocuSign

The deal terms, ready to lock and sign. Figures pull from the live calculators above.

DRAFT — NON-BINDING · NOT EXECUTED. For discussion & counsel review only. Not legal, financial, or tax advice. No funds move and no signatures execute except by the parties through their own bank & e-signature accounts.
These terms are live — lock the deal in the calculator above to freeze them here.

1 · Parties

RoleParty
Investor[INVESTOR LEGAL NAME]
CompanyMirror Engineer, [LLC / S-Corp - in formation] — EIN [pending]
Authorized signatory[NAME, TITLE] (Controller-confirmed)

2 · Deal terms

Deal 1 — Mirror Engineer ($1,000,000), Investor’s election of: Option A — 5-yr amortizing loan at 15% (≈ $23,790/mo); or Option B20% equity with buyback Yr 5–8. These figures are live — they track the Deal calculator above and lock at signing.

3 · CTBS hardware & patents — your first right to invest

The CTBS patented hardware (Climate-Wall & Climate-Deck patents, plus the Climate-Ties, panelized-wall, mold and post-tension designs) is not part of this transaction — no right, license, option, or interest transfers here. What the Investor does get: a first right to invest in CTBS hardware & patents. If CTBS later raises capital on, or sells, that hardware, the Investor may match the terms in writing within [__] days before it is offered to anyone else.

4 · Funds flow (Controller to complete)

FieldValue
BeneficiaryMirror Engineer [new entity]
EIN[NEW ENTITY EIN - pending]
Bank / Routing / Account[BANK] · ABA [ROUTING] · Acct [ACCOUNT #]
Release controlDual confirmation: Controller [NAME] + officer [NAME] must each confirm in writing before funds release.

The wire is initiated by the parties through their own banks; this records the agreed instructions only — it moves no funds.

5 · Signatures — DocuSign-ready (inert until executed by the parties)

INVESTOR
Signature · DocuSign field

Name: [INVESTOR]
Title: [TITLE] · Date: [DATE]

MIRROR ENGINEER [entity]
Signature · DocuSign field

Name: [NAME]
Title: [Controller] · Date: [DATE]

— opens your e-signature flow; nothing is sent or signed by the deck itself.
DRAFT for discussion only. Each party should obtain independent legal & financial counsel before execution. No funds transfer and no signatures execute except by the parties themselves through their own banking & e-signature systems.
The founder

Built by a builder who learned software.

Alma Jessop

Alma Jessop — 30+ years in construction; a Parade of Homes award-winning general contractor. The founder-market fit is the hardest part of this to replicate.

  • Mastered finish carpentry, framing & concrete; framing company at 20, then a licensed GC. Parade of Homes Co-Chair; SLC HBA Board of Directors.
  • Helped develop EstimatorPro & MaderaSoft; demoed at NAHB IBS for years; built Mirror Engineer.
  • Founded Concrete Form Services; co-invented the EZ-Footings forming system. Regional Sales Manager at Western Forms.
  • Designed, patented & built the prior hardware company (Climate-Deck™ & Climate-Wall™); unreleased post-tension systems in development.
  • Today: lead estimator on $10M+ jobs, SWPPP, permits, CAD liaison across all disciplines at Upland Development.
MIRROR ENGINEER™ · CLIMATE TECH BUILDING SYSTEMS, LLC
mirrorengineer.com · climatebuilt.com · Confidential — for investment evaluation. Figures illustrative.
⌂ ALL PITCHES