Drop your plan. AI reads the scale. Get your quantities. Bluebeam, Excel, PlanSwift, yellow notepad — doesn’t matter. No Sunday nights. No guessing.
Drop a plan; the engine reads the engineer’s vector layers, auto-scales with no setup, paints the takeoff on the engineer’s own sheet, and drops out a bid-ready schedule & estimate. Today it does concrete foundation takeoff — built for concrete & foundation contractors and the estimators who bid them. The same engine then extends to framing, the other trades, and the general contractor’s full estimate.

The full 36×24 sheet — painted plan with every footing, wall & step, plus the takeoff schedules.
From one plan, bid-ready — click any to read full size.

| HEIGHT | TOF | TOW | THK | LF | CY | W% | +W CY | |
|---|---|---|---|---|---|---|---|---|
| 4'-0" | 6960.50 | 6964.50 | 10" | 231 | 26.1 | 5% | 27.4 | |
| 4'-6" | 6965.00 | 6969.50 | 10" | 44 | 6.0 | 5% | 6.3 | |
| 4'-9" | 6960.50 | 6965.25 | 10" | 22 | 3.3 | 5% | 3.5 | |
| 5'-3" | 6965.00 | 6970.25 | 10" | 12 | 1.9 | 5% | 2.0 | |
| 5'-6" | 6960.50 | 6966.00 | 10" | 33 | 5.6 | 5% | 5.9 | |
| 7'-6" | 6965.00 | 6972.50 | 10" | 51 | 11.8 | 5% | 12.4 | |
| 8'-0" | 6960.50 | 6968.50 | 10" | 5 | 1.2 | 5% | 1.3 | |
| 8'-6" | 6964.00 | 6972.50 | 10" | 15 | 3.8 | 5% | 4.0 | |
| 10'-0" | 6960.50 | 6970.50 | 10" | 20 | 6.1 | 5% | 6.4 | |
| 11'-6" | 6952.00 | 6963.50 | 10" | 17 | 6.1 | 5% | 6.4 | |
| 12'-6" | 6952.00 | 6964.50 | 10" | 29 | 11.2 | 5% | 11.8 | |
| 12'-9" | 6952.00 | 6964.75 | 10" | 53 | 21.0 | 5% | 22.1 | |
| 13'-3" | 6952.00 | 6965.25 | 10" | 88 | 36.2 | 5% | 38.0 | |
| 16'-0" | 6948.50 | 6964.50 | 16" | 7 | 3.6 | 5% | 3.8 | |
| TOTAL | 627 | 144 | ||||||
| + WASTE → ORDER | 151.2 |
| MARK | WIDTH | T.O.F. | LF | CY | W% | +W CY | |
|---|---|---|---|---|---|---|---|
| FC-2.0 | 2'-0" | per wall | 502 | 23.9 | 5% | 25.1 | |
| FC-1.7 | 1'-8" | per wall | 125 | 5.5 | 5% | 5.8 | |
| TOTAL | 627 | 29.4 | |||||
| + WASTE → ORDER | 30.9 |
| MARK | WIDTH | LF | CY | W% | +W CY | |
|---|---|---|---|---|---|---|
| RW 3'-9" | 3'-9" | 34 | 5.8 | 5% | 6.1 | |
| RW 4'-3" | 4'-3" | 30 | 5.8 | 5% | 6.1 | |
| RW 6'-0" | 6'-0" | 55 | 15.0 | 5% | 15.8 | |
| RW 7'-3" | 7'-3" | 59 | 19.5 | 5% | 20.5 | |
| RW 9'-0" | 9'-0" | 13 | 5.3 | 5% | 5.3 | |
| RETAINING TOTAL | 191 | 51.4 | ||||
| + WASTE → ORDER | 54.0 |
| MARK | SIZE | DEP | QTY | CY | W% | +W CY | |
|---|---|---|---|---|---|---|---|
| FS-2.5 | 2'6×2'6 | 12" | 5 | 1.2 | 5% | 1.3 | |
| FS-3.0 | 3'0×3'0 | 12" | 3 | 1.0 | 5% | 1.1 | |
| FS-3.5 | 3'6×3'6 | 12" | 6 | 2.7 | 5% | 2.8 | |
| FS-4.0 | 4'0×4'0 | 12" | 8 | 4.7 | 5% | 4.9 | |
| FS-4.5 | 4'6×4'6 | 12" | 6 | 4.5 | 5% | 4.7 | |
| FS-5.0 | 5'0×5'0 | 12" | 6 | 5.6 | 5% | 5.9 | |
| FS-5.5 | 5'6×5'6 | 12" | 4 | 4.5 | 5% | 4.7 | |
| FS-6.0 | 6'0×6'0 | 16" | 5 | 8.9 | 5% | 9.3 | |
| FS-6.5 | 6'6×6'6 | 16" | 3 | 6.3 | 5% | 6.6 | |
| FS-7.0 | 7'0×7'0 | 16" | 8 | 29.0 | 5% | 30.5 | |
| FS-7.5 | 7'6×7'6 | 16" | 5 | 20.8 | 5% | 21.8 | |
| FS-8.0 | 8'0×8'0 | 24" | 3 | 14.2 | 5% | 14.9 | |
| FS-8.5 | 8'6×8'6 | 24" | 3 | 16.1 | 5% | 16.9 | |
| FS-9.5 | 9'6×9'6 | 24" | 1 | 6.7 | 5% | 7.0 | |
| TOTAL | 66 | 126.1 | |||||
| + WASTE → ORDER | 132.4 |
| MARK | SIZE | H ft | QTY | CY | W% | |
|---|---|---|---|---|---|---|
| CP-18 | 18"x18" | wall | 1 | 0.33 | 5% | |
| CP-24 | 24"x24" | 10.0 | 2 | 1.19 | 5% | |
| CP-26 | 26"x26" | wall | 2 | 1.39 | 5% | |
| CP-30 | 30"x30" | wall | 1 | 0.93 | 5% | |
| TOTAL | 6 | 3.8 |
| CONFIRMED TOTAL · BY SCOPE | #4 | #5 | ||
| Walls (vert + horiz) | 182 | 311 | ||
| Footings (horiz + J-bar) | 220 | - | ||
| TOTAL 20' STICKS | 402 | 311 | ||
| + WASTE → ORDER | 423 | 327 | ||
| ITEM | BAR | STK | W% | +W STK |
|---|---|---|---|---|
| Footing horiz + J-bar | #4 | 220 | 5% | 231 |
| Spot-footing mat (eng dflt) | #5 | 220 | 5% | 231 |
| Footing-step dowels (eng dflt) | #4 | 6 | 5% | 7 |
| WALL VERT CUTS | BAR | SP | CUT | QTY | STK | W% | +W STK | |
|---|---|---|---|---|---|---|---|---|
| 4'-0" | #4 | 16" | 3'-8" | 173 | 32 | 5% | 34 | |
| 4'-6" | #4 | 16" | 4'-2" | 33 | 7 | 5% | 8 | |
| 4'-9" | #4 | 16" | 4'-5" | 17 | 4 | 5% | 5 | |
| 5'-3" | #4 | 16" | 4'-11" | 9 | 3 | 5% | 4 | |
| 5'-6" | #4 | 16" | 5'-2" | 25 | 7 | 5% | 8 | |
| 7'-6" | #4 | 16" | 7'-2" | 38 | 14 | 5% | 15 | |
| 8'-0" | #4 | 16" | 7'-8" | 4 | 2 | 5% | 3 | |
| 8'-6" | #5 | 12" | 8'-2" | 15 | 7 | 5% | 8 | |
| 10'-0" | #5 | 12" | 9'-8" | 20 | 10 | 5% | 11 | |
| 11'-6" | #5 | 12" | 11'-2" | 17 | 10 | 5% | 11 | |
| 12'-6" | #5 | 9" | 12'-2" | 39 | 24 | 5% | 26 | |
| 12'-9" | #5 | 9" | 12'-5" | 71 | 45 | 5% | 48 | |
| 13'-3" | #5 | 12" | 12'-11" | 88 | 57 | 5% | 60 | |
| 16'-0" | #5 | 12" | 15'-8" | 7 | 6 | 5% | 7 | |
| 556 VERT · #4 182 / #5 311 | ||||||||
| FDN OPENING SPAN | LINTEL REINF | d MIN |
|---|---|---|
| ≤ 4'-0" | (2) #4 | 8" |
| 4'-1" to 6'-0" | (2) #4 | 12" |
| 6'-1" to 9'-0" | (2) #5 | 12" |
| 9'-1" to 10'-0" | (2) #5 T&B | 16" |
| PIER (Det 12) | H ft | VERTS | #3 TIES | W% | +W lb |
|---|---|---|---|---|---|
| CP-24 ◆ (2) | 10.0 | 8×#6 | 28 | 5% | — |
| CP-18 (1) | wall | 8×#6 | 23 | 5% | — |
| CP-26 (2) | wall | 12×#6 | 23 | 5% | — |
| CP-30 (1) | wall | 12×#6 | 28 | 5% | — |
| PIER STEEL (lb) | 1,494 | 1,569 | |||
| MARK | SPEC | QTY | W% | +W EA | |
|---|---|---|---|---|---|
| HD-3 | anchor | 8 | — | 8 | |
| HD-4 | anchor | 6 | — | 6 | |
| HD-5 | anchor | 5 | — | 5 | |
| HD-6 | anchor | 2 | — | 2 | |
| HD-7 | anchor | 3 | — | 3 | |
| TOTAL | 24 | 24 |
| STEP TYPE | SPEC | QTY | W% | +W EA | |
|---|---|---|---|---|---|
| Footing steps (F.S.) | break | 14 | — | 14 | |
| Wall steps (W.S.) | break | 21 | — | 21 | |
| TOTAL | 35 | 35 |
| WASTE % | FOOTINGS | WALLS |
|---|---|---|
| Concrete | ||
| Rebar |
| ORDER | BASE | +WASTE |
|---|---|---|
| Footing conc (CY) | 207.6 | 218.0 |
| Wall conc (CY) | 147.0 | 154.3 |
| Ftg rebar #5 (stk) | 311 | 327 |
| Wall rebar #4 (stk) | 402 | 423 |
| STEEL WEIGHT (lb) | BASE | +WASTE |
|---|---|---|
| Walls + footings #4/#5 | 9,536 | 10,013 |
| Pier verts (#6) | 1,054 | 1,107 |
| Pier #3 ties (153) | 440 | 462 |
| FDN lintels #4/#5 | 414 | 435 |
| Retaining stems | 3,614 | 3,795 |
| TOTAL STEEL (lb) | 15,059 | 15,812 |
| TOTAL STEEL (ton) | 7.53 | 7.91 |
| Concrete (CY) | CY | W% | Order |
|---|---|---|---|
| Continuous footings (FC-1.7/2.0) | 29.4 | % | - |
| Spot footings (FS) | 126.1 | % | - |
| Retaining-wall footings | 51.4 | % | - |
| Foundation walls | 144.0 | % | - |
| Concrete piers (callout depths) | 11.8 | % | - |
| Total concrete | 362.7 | - |
| Steel (lb) | lb | W% | Order |
|---|---|---|---|
| Footing rebar (horiz + J-bar)* | 2,365 | % | - |
| Retaining-wall stems | 3,614 | % | - |
| Wall rebar (vert+horiz)* | 7,171 | % | - |
| Pier verticals #6 | 1,054 | % | - |
| Pier #3 ties (153) | 440 | % | - |
| FDN lintels | 414 | % | - |
| Total steel | 15,058 | - | |
| Total steel (ton) | 7.53 | - |
The schedules are the product. Quantities pull from the painted plan; unit prices pull from your own cost DB (860+ SKUs); it exports to Google Sheets, QuickBooks & Revit — a bid-ready printout, not a markup someone still has to total by hand.
Click any image to zoom.
An 18-month Revit build of the full EZ-Footings and Western Forms forming families, modeled to spec. Drop them onto a real foundation plan and the model becomes a forming layout — and an equipment order. Below: EZ-Footings / Western Forms forming modeled on the Silver Mine Road foundation set.
The full priced takeoff/estimate the engine generates from a dropped plan — a real, rendered report (sample job).
The 18-month BIM build: an organized Revit family library — EZ-Footings, forming walls (aluminum/steel/precast), Climate-Deck, CMU, rebar and more — the families that turn a 3D model into a forming layout and an equipment order. AI auto-modeling coming soon via the WiseBIM integration — drop a PDF, the model builds itself.
That’s where this is going. You drop your foundation plan — any stamped PDF — and the AI builds the 3D Revit model for you. Every wall. Every footing. Every form. Every tie. Placed automatically. Counted automatically. Estimated automatically. No Revit experience required. No manual placement. Just drop the plan and walk away. Come back to a complete, accurate estimate ready to send to your contractor.
This is the WiseBIM integration — currently in development. When it’s live, Mirror Engineer goes from the best estimating methodology in construction to the fastest. Drop, mirror, estimate, order. Fully automatic. Right now, the included 20-video training series gets you there manually — and the methodology is identical. Same families. Same schedule. Same estimate. Just you placing the walls instead of the AI.
The hardware company — patented systems & forming, embedded.
Alma Jessop — 30+ years in construction; a Parade of Homes award-winning general contractor. The founder-market fit is the hardest part of this to replicate.